In July 2026, Nepal and India agreed to raise Nepal’s electricity export capacity to India from 1,100 MW to 1,650 MW. Energy trade with India is a frequent Lok Sewa topic, so here are the verified key facts.
The July 2026 Agreement
| Direction | Earlier capacity | New capacity |
|---|---|---|
| Export (Nepal to India) | 1,100 MW | 1,650 MW (+550 MW) |
| Import (India to Nepal) | 1,000 MW | 1,400 MW |
- The decision was made at the 13th meeting of the Nepal–India Joint Steering Committee (JSC) on energy cooperation, held at energy-secretary level in Pokhara in July 2026.
- The capacity is the combined transfer capacity of the Dhalkebar–Muzaffarpur and Dhalkebar–Sitamarhi 400 kV cross-border lines.
- Actual exports depend on India approving the list of Nepali hydropower projects allowed to sell power under the new limit.
After the Bhote Koshi Flood: Imports in Winter
- The 26 August 2026 Bhote Koshi flood damaged about a dozen power projects and transmission lines in Nepal.
- In September 2026, India approved supplying up to 654 MW to Nepal for 18 hours a day (midnight to 6 pm) from 13 September to 31 December 2026, to cover Nepal’s expected winter shortfall of 350–400 MW.
- Export quantities from January 2027 will be reviewed in December 2026.
Cross-Border Lines to Remember
- Dhalkebar–Muzaffarpur 400 kV: Nepal’s first 400 kV cross-border line. Dhalkebar is in Dhanusha, Nepal; Muzaffarpur is in Bihar, India.
- New Butwal–Gorakhpur: connects Nepal with Uttar Pradesh. It will first run at 220 kV until the New Butwal substation is completed (planned for December 2027).
- Tanakpur–Mahendranagar 132 kV: an older link in the far west.
Practice MCQs
- Under the July 2026 agreement, Nepal’s power export capacity to India rose to:
a) 1,100 MW b) 1,400 MW c) 1,650 MW d) 2,000 MW
Answer: c) 1,650 MW - Where was the 13th Nepal–India Joint Steering Committee meeting on energy held in 2026?
a) Kathmandu b) New Delhi c) Pokhara d) Patna
Answer: c) Pokhara - Dhalkebar substation is in which district?
a) Mahottari b) Dhanusha c) Sarlahi d) Siraha
Answer: b) Dhanusha - The New Butwal–Gorakhpur line connects Nepal with which Indian state?
a) Bihar b) Uttarakhand c) Uttar Pradesh d) West Bengal
Answer: c) Uttar Pradesh - Why did Nepal need extra power imports from India in late 2026?
a) A new cement industry b) Flood damage to power projects c) Lower rainfall d) A transmission strike
Answer: b) Flood damage to power projects
Related Notes
- Economics and Planning notes
- Nepal Budget 2083/84 highlights
- Monsoon disasters 2026
- All Current Affairs posts
- Free Lok Sewa practice quizzes
Sources: Khabarhub: Nepal and India agree to raise export capacity to 1,650 MW; The Kathmandu Post: 550 MW more export under new agreement; The Kathmandu Post: India approves 654 MW supply to Nepal. Last updated: 20 October 2026.
Why this matters for Lok Sewa
- Energy trade with India is a frequent topic in the economy and foreign relations sections.
- Link it with Nepal’s trade deficit and hydropower development in long answers.
Quick practice questions
- Nepal’s export capacity to India was raised to how many MW? Answer: 1,650 MW (from 1,100 MW).
- Which cross-border lines carry this power? Answer: The Dhalkebar–Muzaffarpur and Dhalkebar–Sitamarhi 400 kV lines.